Terminal and Connector Inspection
1.

Many malfunctions in the electrical system are caused by poor harness and terminals. Faults can also be caused by interference from other electrical systems, and mechanical or chemical damage.

2.

Thoroughly check connectors for looseness, poor connection, bending, corrosion, contamination, deterioration, or damage.

3.

Has a problem been found?

YES

▶ Repair as necessary and go to "Verification of Vehicle Repair" procedure

NO

▶ Go to "Signal Circuit Inspection" procedure.

Signal Circuit Inspection

■ Check voltage

1.

IG "OFF" and disconnect IATS connector.

2.

IG "ON" and ENG "OFF"

3.

Measure voltage between signal terminal of IATS harness connector and chassis ground.

a.

Specification : Approx. 5V

note
To view Flash content, you need to install the appropriate browser extension
4.

Is the measured voltage within specification ?

YES

a.

Go to "Ground Circuit Inspection" procedure.

NO

a.

If the voltage is 0V, go to "Check open in harness" as follows. If the voltage is more than 5.1V, go to "Check short to battery in harness" as follows.

■ Check short to battery in harness

5.

IG "OFF" and disconnect IATS connector and PCM connector.

6.

Measure resistance between signal terminal of IATS harness connector and power terminal of MAFS harness connector.

7.

Measure resistance between signal terminal of IATS harness connector and signal terminal of MAFS harness connector.

a.

Specification : Infinite

note
To view Flash content, you need to install the appropriate browser extension
8.

Is the measured resistance within specification?

YES

a.

Go to "Component Inspection" procedure.

NO

a.

Repair short to battery in harness and go to "Verification of Vehicle Repair" procedure.

■ Check open in harness

9.

IG "OFF" and disconnect IATS connector and PCM connctor.

10.

Measure resistance between signal terminal of IATS harness connector and IATS signal terminal of PCM harness connector.

a.

Specification : below 1Ω

note
To view Flash content, you need to install the appropriate browser extension
11.

Is the measured resistance within specification?

YES

a.

Go to "Ground Circuit Inspection" procedure.

NO

a.

Repair open in harness and go to "Verification of Vehicle Repair" procedure.

Ground Circuit inspection

■ Check open in harness

1.

IG "OFF" and disconnect IATS connector and then IG "ON".

2.

Measure voltage between signal terminal of IATS harness connector and chassis ground.(Measurement "A")

3.

Measure voltage between signal and ground terminals of IATS harness connector.(Measurement "B")

a.

Specification : Voltage difference between measurement "A" and "B" is below 200mV.

note
To view Flash content, you need to install the appropriate browser extension
note
To view Flash content, you need to install the appropriate browser extension
4.

Is the measured voltage within specification ?

YES

▶ Go to "Component Inspection" procedure.

NO

▶ Repair contact resistance or open in harness and go to "Verification of Vehicle Repair" procedure.

Яндекс.Метрика