REPLACEMENT
1.

Remove the intercooler.

(1)

Disconnect the integrated connector(C) that connectors the BPS(Boost Pressure sensor) sensor connector(A) and the VGT solenoid valve connector(B).

(2)

Remove the intercooler hose(A).

(3)

Remove the VGT solenoid valve.

(4)

Remove the intercooler(C).

Tightening torque :

80 ~ 120N.m (0.8 ~ 1.2kgf.m, 5.8 ~ 8.7lb-ft)

Яндекс.Метрика