Remove the alternator. (See EE group - alternator)
Remove the intercooler hose.
Remove the engine coolant bleed hose.
Remove the radiator upper hose.
Disconnect the engine wire harness connectors from intake manifold side.
Remove the oil level gauge(A).
Remove the common rail(A).(See FL group)
Remove the thermostat housing(A).
Tightening torque :
20 ~ 25N.m (2.0 ~ 2.5kgf.m, 15 ~ 18lb-ft)
Remove the EGR throttle body(A).
Tightening torque :
10 ~ 12N.m (1.0 ~ 1.2kgf.m, 7 ~ 9lb-ft)
Remove the intake manifold(A).
Tightening torque :
15 ~ 22N.m (1.5 ~ 2.2kgf.m, 11 ~ 16lb-ft)
Installation is in the reverse order of removal.