INSTALLATION
1.

Install the cable assembly placing the select and shift lever in neutral position.(see to Transaxle installation)

2.

Install the retainer(A) and nuts(B).

3.

Install the shift lever assembly(A).

TORQUE :

9~14Nm(0.9~1.4kgf.m, 6~9.5Ib-ft)

4.

Install the clip(A) connecting the shift cable and the shift lever.

5.

Move the slide clip(B) of guide member(A) in the direction as shown in the illustration.

note

Adjust the slide clip fit into the select lever moving the slide clip in the direction.

6.

Install the guide member(A) of the select cable(B).

7.

Adjust the slide clip(B) to fit it into the select lever pin(A) and install the snap pin(C).

note

Insert the slide clip in the direction as shown in the illustration.

8.

Install the center console(A).

[LHD]
[RHD]
9.

Install the upper cover(A) to the center conole.

[LHD]
[RHD]
Яндекс.Метрика