Inspection
1.

Disconnect the negative (-) battery terminal.

2.

Remove the crash pad lower panel.

(Refer to the BD group - "Crash pad")

3.

Remove the junction box.

4.

There should be continuity between the No.6 of I/P-F and No.14 terminal of I/P-F when power and ground are connected to the No.10 terminal of I/P-E and No.2 terminal of I/P-J.

5.

There should be no continuity between the No.6 terminal of I/P-F and No.14 terminal of I/P-D when power is disconnected.

Яндекс.Метрика