INSTALLATION
1.

Install the intake manifold.

Tightening torque :

15 ~ 20N.m(1.5 ~ 2.0kgf.m, 10.8 ~ 14.5lb-ft)

2.

Install the delivery pipe.(See FL group).

3.

Install the throttle flap vacuum hose.

4.

Install the coolant bleed hose.

5.

Install the radiator hose.

6.

Install the intercooler hose.

7.

Install the alternator.

Яндекс.Метрика