Installation
1.

Installation is reverse of removal.

caution

Before replacing or reinstalling the injector and the washer,make sure to remove carbon deposits from the injector holes using the hole cleaning tool [SST No.:09351-27300](to ensure sealability against exhaust gas).

caution

If re-installing injectors after removing, clean the injector bodies and contact surfaces with washers as well as the injector holes. Once the injector have been removed, the mating copper washer (A) must be replaced with new one.

note

When installing the high pressure fuel pipe connecting the common rail and injector, follow the below procedure.

-

Temporarily install the nuts on common rail and injector

-

Install the injector side and common rail side sequentially

note

When installing the high pressure fuel pipe, apply the specified tightening torques with the special service tool (Refer to below table).

Item

Dimension

SST No.

Flange Nut

(Injector Side)

14 mm (0.551 in)

09314-27110

Flange Nut

(Common Rail Side)

17 mm (0.669 in)

09314-27120

Injector clamp installation bolt:

29.4 ~ 33.4 N.m (3.0 ~ 3.4 kgf.m, 27.1 ~ 24.6 lb-ft)

High pressure fuel pipe installation nut:

24.5 ~ 28.4 N.m (2.5 ~ 2.9 kgf.m, 18.1 ~ 21.0 lb-ft)

Яндекс.Метрика