Because both A/T and M/T fuel control map is inputted in one type of ECM and selecting option is possible, one type is applied to both A/T and M/T option.
When ECM is installed to vehicle, A/T and M/T recognition is performed by ECM automatically as checking whether ground line is grounded or opened.(A/T and M/T recognition is performed every IG KEY ON process.)
If A/T, M/T recognition is not fulfilled well or any error occurs during the process, engine power generation is not sufficient and glow lamp on cluster blinks.
A/T : ECM connector terminal of automatic recognition is grounded.
M/T : ECM connector terminal of automatic recognition is opened (no wiring exists).