Removal
1.

Move the shift lever to neutral gear position.

2.

Remove the air cleaner assembly.

(Refer to Engine Mechanical System - "Air Cleaner")

3.

Remove the battery and battery tray.

(Refer to Engine Electrical System - "Battery")

4.

Remove the ECM.

(Refer to Engine Control System - "ECM")

5.

Disconnect the shift cable (A) and select cable (B) after removing the snap pin (C).

6.

Remove the control shaft complete (A) after loosening the bolts.

Tightening torque:

19.6 ~ 26.5 N.m (2.0 ~ 2.7 kgf.m,14.5 ~ 19.5 lb-ft)

Installation
1.

Install in the reverse order of removal.

note

When installing, set control shaft lever to neutral position.

When installing, apply the sealant as shown in the illustration.

Specified sealant : MS 721-40 or MS721-38

caution

Check operating of lever of transaxle side when operating shift lever after assembly. (1~6,R)

Яндекс.Метрика