Removal
1.

Move the shift lever to neutral gear position.

2.

Remove the air cleaner assembly.

(Refer to Engine Mechanical System - "Air Cleaner")

3.

Remove the battery and battery tray.

(Refer to Engine Electrical System - "Battery")

4.

Remove the ECM.

(Refer to Engine Control System - "ECM")

5.

Disconnect the shift cable (A) and select cable (B) after removing the snap pin (C).

6.

Remove the control shaft complete (A) after loosening the bolts.

Tightening torque:

19.6 ~ 26.5 N.m (2.0 ~ 2.7 kgf.m,14.5 ~ 19.5 lb-ft)

Installation
1.

Install in the reverse order of removal.

note
●

When installing, set control shaft lever to neutral position.

●

When installing, apply the sealant as shown in the illustration.

Specified sealant : MS 721-40 or MS721-38

caution
●

Check operating of lever of transaxle side when operating shift lever after assembly. (1~6,R)

Яндекс.Метрика