INSTALLATION
1.

Install the common rail according to the reverse order of "REMOVAL" procedure.

note

When installing the high pressure pipe, apply the specified tightening torques to the flange nuts of the injectors, the high pressure pipe, and the common rail side with SST (Refer to below table).

Item

Dimension

SST No.

Flange Nut (Injector Side)

14 mm (0.551 in)

09314-27110

Flange Nut (HP Pump Side)

Flange Nut (Common Rail Side)

17 mm (0.669 in)

09314-27120

· Common rail mounting bolts: 19.6 ~ 26.5 N·m (2.0 ~ 2.7 kgf·m, 14.5 ~ 19.5 lbf·ft)

· High pressure pipe flange nuts (Injectors ↔ Common Rail): 24.5 ~ 28.4 N·m (2.5 ~ 2.9 kgf·m, 18.1 ~ 20.1 lbf·ft)

· High pressure pipe flange nuts (Common Rail ↔ HP Pump): 24.5 ~ 28.4 N·m (2.5 ~ 2.9 kgf·m, 18.1 ~ 20.1 lbf·ft)

Яндекс.Метрика