INSTALLATION
1.

Install the lower arm mounting bolts(A).

Tightening torque

A bushing :

100~120 Nm (1000~1200 Kgf·cm, 73.8~88.5 Ibf·ft)

G bushing :

140~160 Nm (1400~1600 Kgf·cm, 103.3~118.0 Ibf·ft)

2.

Install the lower arm ball joint mounting bolts(A).

Tightening torque

100~120 Nm (1000~1200 Kgf·cm, 73.8~88.5 Ibf·ft)

3.

Install the front wheel and tire(A) on the front hub(B).

Tightening torque

90~110 Nm (900~1100 Kgf·cm, 66.4~81.2 Ibf·ft)

caution

Be careful not to damage the hub bolts(C) then install the front wheel and tire(A).

Яндекс.Метрика