Install the bushing(B) on the stabilizer bar(A).
Bring clamp(C) of stabilizer bar(A) into contact with bushing(B).
Install the bracket on the bushing(B).
After tightening the bolts of the bushing bracket temporarily, install the bushing bracket on the opposite side.
Tightening torque
50~65 Nm (500~650 Kgf·cm, 36.9~48.0 Ibf·ft)
Install the rear mounting bolts of sub-frame.
Install the nut(B) on the stabilizer bar link(A).
Tightening torque
100~120 Nm (1000~1200 Kgf·cm, 73.8~88.5 Ibf·ft)
Install the front wheel and tire(A) on the front hub(B).
Tightening torque
90~110 Nm (900~1100 Kgf·cm, 66.4~81.2 Ibf·ft
Be careful not to damage the hub bolts(C) then install the front wheel and tire(A).