Disassembly
1.

Remove the front right tire (A).

2.

Remove the engine side cover (A).

3.

Remove the wheel house (A).

4.

Remove the center bolt (A) while holding the disc & hub assembly with SST( 09977-29000).

Tightening torque :

10~15N.m (1.02~1.53kgf.m, 7.37~11lbf.ft)

5.

Remove the disc & hub assembly (A) and shim (gap washer), taking care not to lose the shims.

6.

Loosen the drive belt.

(Refer to EM group - "Drive Belt")

7.

Disconnect the retainer ring (A) and then remove the pulley (B).

note
-

Be careful not to damage the pulley (B) and compressor during removal/installation.

-

Once retainer ring (A) is removed, replace it with a new one.

8.

Remove the retainer ring (B) and then remove the field coil (C) . Be careful not to damage the coil and compressor.

9.

Reassemble the compressor clutch in the reverse order of disassembly, and note these items :

A.

Clean the pulley and compressor sliding surfaces with non-petroleum solvent.

B.

Install new retainer rings, and make sure they are fully seated in the groove.

C.

Make sure that the pulley turns smoothly after its reassembled.

Яндекс.Метрика