Disconnect the battery negative terminal first, then the positive terminal.
Tightening torque :
7.8 ~ 9.8 N.m (0.8 ~ 1.0 kgf.m, 5.8 ~ 7.2 lb-ft)
Remove the air duct and air cleaner assembly. (Refer to EM group - "Engine and transaxle assembly")
Remove the battery.
Remove the battery insulation pad (A).
Remove the battery mounting bracket (B).
Tightening torque:
8.8 ~ 13.7 N.m (0.9 ~ 1.4 kgf.m, 6.5 ~ 10.1 lb-ft)
Remove the battery (C).
Disconnect the ECM connectors (A) and remove the ECM (B).
Tightening torque:
9.8 ~ 11.8 N.m (1.0 ~ 1.2 kgf.m, 7.2 ~ 8.7 lb-ft)
Loosen the battery “+” cable bracket mounting bolt (A) and then remove the battery tray (B).
Tightening torque:
8.8 ~ 13.7 N.m (0.9 ~ 1.4 kgf.m, 6.5 ~ 10.1 lb-ft)
Installation is the reverse order of removal.
When installing the battery, fix the mounting bracket on the tray correctly.