INSTALLATION
1.

Install the common rail(A) with two mounting bolts(B).

Tightening Torque : 14.7 ~ 21.6 N·m (10.9 ~ 15.9 lbf·ft)

2.

Install the intake manifold. (Refer to "EM" group).

3.

Connect rail pressure sensor and rail pressure control valve connectors.

4.

After screwing the high pressure pipe installation nuts by hand, tighten them at accutate torque using special service tools(09314-27110, 09314-27130).

5.

Connect return line(C).

6.

Connect the negative battery(-) terminal.

7.

Start the engine and check for leakage on fuel line.

Яндекс.Метрика