REASSEMBLY
1.

Install the deflector.(After engaging the clip, connect the link base stopper)

2.

Insert the shutting into the rail.

caution

Do not confuse the left and right sides.

3.

Install the slide to the cable. Move the timing front edge to be aligned with the slide of the guide assembly.

4.

Face the protrusion of "Shoe A" upward, the cushion of "Shoe B" downward.

5.

Insert the protrusion of the slide to the grove of the shutting.

6.

If the steps 3,4,5 are O.K, insert the guide assembly to the rail and the inside pin to the lowest rail.

7.

Fully insert the guide assembly into the rail. Completely push the slide until it touches the timing front using a screwdriver.

8.

Install the sunshade and insert the stopper.

caution

When installing the sunshade, the protector should be inserted securely.

9.

Insert the motor cable into the drive unit assembly tube.

10.

Install the drive unit to the frame.

11.

Install the motor and controller and engage the connector.

Яндекс.Метрика