Component Inspection
1.

Check Main Relay

(1)

IG "OFF"

(2)

Disconnect Main Relay

(3)

Measure resistance between terminal 5 and 3 of Main Relay

(4)

Measure resistance between terminal 4 and 2 of Main Relay.

a.

Specification :

Terminal

Continuity

3 ~ 5

NO

2 ~ 4

YES (Approx. 70Ω ~ 120Ω)

(5)

Is the measured reisistance within specification ?

YES

▶ Substitute with a known - good PCM and check for proper operation.

If the problem is corrected, replace PCM and go to "Verification of Vehicle Repair" procedure.

caution

There is a memory reset function on scantool that can erase optional parts automatically detected and memorized by PCM.

NO

▶ Substitute with a known - good Main Relay and check for proper operation.

If the problem is corrected, replace Main Relay and go to "Verification of Vehicle Repair"procedure.

Яндекс.Метрика