Compression pressure inspection
note

If the there is lack of power, excessive oil consumption or poor fuel economy, measure the compression pressure.

1.

Warm up the engine until the normal operating temperature becoming 80~95°C(176~203°F).

2.

Remove the surge tank.

3.

Remove the ignition coil connectors(A) and ignition coils.

4.

Using a 16mm plug wrench, remove the 6 spark plugs.

5.

Check cylinder compression pressure.

(1)

Insert a compression gauge into the spark plug hole.

(2)

Open the throttle fully.

(3)

With the fully-open throttle in crank the engine, measure the compression pressure.

note

Always use a fully charged battery to get the engine speed of 250 rpm or more.

Repeat steps 1) through 3) for each cylinder.

note

This measurement must be done in as short a time as possible.

Compression pressure: 1,176.79kPa (12.0kgf/cm², 170.68psi) - 200 ~ 250rpm

Minimum pressure: 1,029.69kPa (10.5kgf/cm², 149.34psi)

Difference between cylinders: 98.07kPa (1.0kgf/cm², 14.22psi)

(4)

If the compression pressure in 1 or more cylinders is lower than the specification above, pour a small amount of engine oil into the cylinder through the spark plug hole, repeat the steps (1) through (3) for the cylinder and measure the pressure again.

A.

If adding oil increases the pressure, the piston rings or cylinder bores might be worn or damaged.

B.

If the pressure doesn't increase, a valve may be sticking or seating may be improper, or there may be leakage from the gasket.

6.

Reinstall the spark plugs.

7.

Install the ignition coils and connect ignition coil connectors.

8.

Install the surge tank.

VALVE CLEARANCE INSPECTION AND ADJUSTMENT
note

Inspect and adjust the valve clearance when the engine is cold (Engine coolant temperature : 20°C±5°C(59~77°F)) and cylinder head is installed on the cylinder block.

1.

Remove the engine cover.

2.

Remove air cleaner assembly.

3.

Remove the surge tank.

4.

Remove the cylinder head cover.

(1)

Disconnect the ignition coil connector and remove the ignition coil.

(2)

Remove the cylinder head cover.

5.

Set the piston of the No.1 cylinder to TDC(Top Dead Center) position.

(1)

Turn the crankshaft pulley clockwise and align its groove with the timing mark "T" of the timing chain cover.

(2)

Check that the timing marks on the camshaft sprocket are in a straight line with the rocker cover mark for No. 1 cylinder TDC as shown in the illustration.

note

If not, turn the crankshaft one revolution clockwise.

6.

Inspect the intake and the exhaust valve clearance.

(1)

With No. 1 cylinder at TDC the valve clearance can be measured as shown below.

Measurement method.

A.

Using a thickness gauge, measure the clearance between the tappet and the base circle of camshaft.

B.

Record the out-of-specification valve clearance measurements. They will be used later to determine the required adjusting tappet for replacement.

Specification

Limit (Engine coolant temperature : 20°C [68°F])

Intake : 0.10 ~ 0.30mm (0.0039 ~ 0.0118in.)

Exhaust : 0.20 ~ 0.40mm (0.0079 ~ 0.0157in.)

(2)

Turn the crankshaft pulley one revolution (360°) clockwise and align the groove with the timing mark "T" of the timing chain cover.

(3)

With the piston of the No.4 cylinder positioning at TDC, the valves which can be measured its clearance are as shown below.

7.

Adjust the intake and the exhaust valve clearances.

(1)

Set the piston of the No.1 cylinder to the TDC/position.

(2)

Remove the timing belt.

(3)

Remove the camshaft bearing caps(A, B).

(4)

Remove the camshaft assembly.

(5)

Remove MLA(Mechanical Lash Adjuster)s.

(6)

Measure the thickness of the removed tappet using a micrometer.

(7)

Calculate the thickness of a new tappet so that the valve clearance comes within the specified value.

T : Thickness of removed tappet

A : Measured valve clearance

N : Thickness of new tappet

Intake : N = T + [A - 0.20mm(0.0079in.)]

Exhaust : N = T + [A - 0.25mm (0.0098in.)]

(8)

Select a new tappet with a thickness as close as possible to the calculated value.

note

Tappets are available with 41different size increments of 0.015mm (0.0006in.) from 3.00mm (0.118in.) to 3.600mm (0.1417in.)

(9)

Place a new tappet on the cylinder head.

note

Apply engine oil on the periphery surface of the selected tappet.

(10)

Install the intake and exhaust camshafts.

(11)

Install the bearing caps.

(12)

Install the timing belt.

(13)

Turn the crankshaft two revolutions in the operating direction(clockwise) and realign crankshaft sprocket and camshaft sprocket timing marks(A).

(14)

Recheck the valve clearance.

Specification (Engine coolant temperature: 20°C[68°F])

Intake : 0.17 ~ 0.23mm (0.0067 ~ 0.0090in.)

Exhaust : 0.27 ~ 0.33mm (0.0106 ~ 0.0129in.)