Component Inspection
Check Solenoid Velve
1.

Ignition "OFF"

2.

Disconnect "A/T SOLENOID VALVE" connector

3.

Measure resistance between terminal "7" and terminal "8" of the ATM SOLENOID VALVE harness connector

a.

Specification: Approximately 4.35 ± 0.35 Ω (20℃)

4.

Is resistance within specifications?

YES

a.

Go to "CHECK PCM/TCM" as below

NO

a.

Replace "PRESS CONTROL SOL VALVE(VFS)" as necessary and go to "Verification Vehicle Repair" procedure

CHECK PCM/TCM
5.

Connect scantool to data link connector(DLC)

6.

Ignition "ON" & Engine "OFF".

7.

Select A/T Solenoide valve Actuator test and Operate Actuator test.

8.

Can you hear operating sound for "PRESS CONTROL SOL VALVE(VFS)" Actuator Testing Function ?

YES

a.

Go to "Verification Vehicle Repair" procedure

NO

a.

Replace PCM/TCM as necessary and Go to "Verificaiton Vehicle Repair" procedure

ACTUATOR TEST CONDITION

1. IG SWITCH ON

2. TRANSAXLE RANGE SWITCH is normal

3. P RANGE

4. Vehicle Speed 0km/h

5. Throttle position sensor< 1V

6. IDLE SWITCH ON

7. ENGINE RPM 0

Яндекс.Метрика