Installation is reverse of removal.
CVVT oil control valve installation bolt:
9.8 ~ 11.8 N.m (1.0 ~ 1.2 kgf.m, 7.2 ~ 8.7 lbf.ft)
Pay attention to color of valve connector (Component and harness side) when installing. If an OCV is installed on opposite bank, the engine may be damaged.
Item | Component Side | Harness Side |
Bank1 (RH) | Grey | |
Bank 2(LH) | Black |