Installation
1.

Installation is reverse of removal.

CVVT oil control valve installation bolt:

9.8 ~ 11.8 N.m (1.0 ~ 1.2 kgf.m, 7.2 ~ 8.7 lbf.ft)

caution

Pay attention to color of valve connector (Component and harness side) when installing. If an OCV is installed on opposite bank, the engine may be damaged.

[Connector Color]

Item

Component

Side

Harness Side

Bank1 (RH)

Grey

Bank 2(LH)

Black

Яндекс.Метрика