Install the water pump(A) with new gaskets (B).
• Clean the contact face before assembly.
• Always use a new bolt (C) and gaskets.
Tightening torque
G(4): 21.6 ~ 23.5N.m (2.2 ~ 2.4kgf.m, 15.9 ~ 17.4lb-ft)
H(1 : 9.8 ~ 11.8N.m (1.0 ~ 1.2kgf.m, 7.2 ~ 8.7lb-ft)
I(1): 9.8 ~ 11.8N.m (1.0 ~ 1.2kgf.m, 7.2 ~ 8.7lb-ft)
J(1): 9.8 ~ 11.8N.m (1.0 ~ 1.2kgf.m, 7.2 ~ 8.7lb-ft)
K(4): 9.8 ~ 11.8N.m (1.0 ~ 1.2kgf.m, 7.2 ~ 8.7lb-ft)
L(1): 21.6 ~ 26.5N.m (2.2 ~ 2.7kgf.m, 15.9 ~ 19.5lb-ft)- New bolt
Install the water pump pulley (A).
Tightening torque
7.8 ~ 9.8N.m (0.8 ~ 1.0kgf.m, 5.8 ~ 7.2lb-ft)
Install the drive belt(A).
Fill with engine coolant.
Start engine and check for leaks.
Recheck engine coolant level.
Clean the contact face before assembly.
Install the water temperature control assembly(A) with new gasket.
Tightening torque
19.6 ~ 23.5Nm (2.0 ~ 2.4kgf.m, 14.5 ~ 17.4lb-ft)
Use new center tube O-ring when reassembling.
Connect the water hoses to the water temperature control assembly.
Install the wiring protector.
Connect the WTS & gauge unit connector.
Connect the radiator upper hose (A) and the lower hose (B).
Install the air cleaner assembly.
Fill with engine coolant.
Start engine and check for leaks.
Recheck engine coolant level.