Installation

Installation is in the reverse order of removal.

Perform the followings :

●

Adjust shift cable.

●

Adjust throttle cable.

●

Refill engine with engine oil.

●

Refill transaxle with fluid.

●

Refill radiator and reservoir tank with engine coolant.

●

Place heater control knob on "HOT" position.

●

Bleed air from the cooling system.

-

Start engine and let it run until it warms up. (until the radiator fan operates 3 or 4 times.)

-

Turn Off the engine. Check the level in the radiator, add coolant if needed. This will allow trapped air to be removed from the cooling system.

-

Put radiator cap on tightly, then run the engine again and check for leaks.

●

Clean battery posts and cable terminals with sandpaper assemble them, then apply grease to prevent corrosion.

●

Inspect for fuel leakage.

-

After assemble the fuel line, turn on the ignition switch (do not operate the starter) so that the fuel pump runs for approximately two seconds and fuel line pressurizes.

-

Repeat this operation two or three times, then check for fuel leakage at any point in the fuel line.

Яндекс.Метрика