Component Inspection
1.

CHECK SOLENOID VELVE

(1)

Ignition "OFF".

(2)

Disconnect "A/T SOLENOID VALVE" connector

(3)

Measure resistance between "PCSV-C(UD)" terminal and "Ground" terminal of the ATM SOLENOID VALVE harness connector

Specification: Approximately 3.5 ± 0.2 Ω (25℃)

note
To view Flash content, you need to install the appropriate browser extension
note
To view Flash content, you need to install the appropriate browser extension
(4)

Is resistance within specifications?

▶ Go to "CHECK PCM/TCM" as below

▶ Replace PCSV-C(UD) SOLENOID VALVE as necessary and go to "Verification Vehicle Repair" procedure

2.

CHECK PCM/PCM/TCM

(1)

Connect GDS to data link connector(DLC)

(2)

Ignition "ON" & Engine "OFF".

(3)

Select A/T Solenoide valve Actuator test and Operate Actuator test.

▶ Go to "Verification Vehicle Repair" procedure

▶ Replace PCM/TCM as necessary and Go to "Verificaiton Vehicle Repair" procedure

ACTUATOR TEST CONDITION

1. IG SWITCH ON

2. TRANSAXLE RANGE SWITCH is normal

3. P RANGE

4. Vehicle Speed 0km/h

5. Throttle position sensor< 1V

6. IDLE SWITCH ON

7. ENGINE RPM 0

Яндекс.Метрика