INSTALLATION
1.

Install the retainer (A) and nuts (B).

TORQUE : 12-15Nm (1.2-1.5kgf.m, 8.7-10.8Ib-ft)

note

In case, install the crush pad and cowl cross bar. (refer to Crush pad in BD group and Heater unit in HA group)

2.

Install the shift lever assembly (A).

TORQUE : 9-14Nm (0.9-1.4kgf.m, 6.5-10.1Ib-ft)

3.

Connect the interlock switch connector (A).

4.

Install the shift cable assembly (B) by installing the clamp (A).

5.

Install the center console. (refer to Console in BD group)

6.

Install the center console cover (A).

7.

Install the shift lever knob (A).

8.

Install the shift cable assembly to transaxle. (refer to Automatic transaxle's installation)

note

Before completing installation, adjust the shift cable referring to ADJUSTMENT section.

Яндекс.Метрика