Installation
1.

Install the transaxle lower mounting bolts (A-3ea,B-1ea) after fitting the transaxle assembly into the engine assembly.

Tightening torque :

[A] 35~50 N.m (3.5~5.0 kgf.m, 25.3~36.2 lb-ft)

[B] 43~55 N.m (4.3~5.5 kgf.m, 31.1~39.8 lb-ft)

2.

Install the bolt (A) left in the engine side.

Tightening torque :

43~55 N.m (4.3~5.5 kgf.m, 31.1~39.8 lb-ft)

3.

Install the clutch release cylinder assembly (A).

Tightening torque :

15~22 N.m (1.5~2.2 kgf.m, 10.8~15.9 lb-ft)

4.

Install the roll stopper bracket by installing bolts (A,B).

Tightening torque :

50~65 N.m (5.0~6.5 kgf.m, 36.2~47.0 lb-ft)

5.

Install the intercooler pipe (A).

6.

Install the dust cover by installing the bolts(2ea).

7.

Install the drive shafts to the transaxle. (Refer to Front Driveshaft in DS group)

8.

Refill the transaxle fluid through the filler hole. (Refer to Service Adjustment Procedure)

9.

Install the under shield cover (A).

10.

Install the lower arm ball joint mounting nut and the stabilizer link mounting nut to the front knuckles.

(Refer to Front suspension system in SS group)

11.

Install the front wheels and tires.

12.

Install the transaxle support bracket bolts (2ea).

Tightening torque :

60~80 N.m (6.0~8.0 kgf.m, 43.4~57.9 lb-ft)

13.

Install the transaxle upper mounting bolts (A-2ea) the starter motor mounting bolts (B-2ea).

Tightening torque :

[A] 60~80 N.m (6.0~8.0 kgf.m, 43.4~57.9 lb-ft)

[B] 39~60 N.m (3.9~6.0 kgf.m, 28.2~43.4 lb-ft)

14.

Put aside the engine support fixture (09200-38001).

15.

After installing the bracket mounting bolt (C), install the clutch tube (B) with the clip (A).

Tightening torque :

15~22 N.m (1.5~2.2 kgf.m, 10.8~15.9 lb-ft)

16.

Install the CKP sensor by installing a bolt.

17.

Install the control cable bracket by installing bolts(3ea).

Tightening torque :

15~22 N.m (1.5~2.2 kgf.m, 10.8~15.9 lb-ft)

18.

Install the clips (B) and pins (A).

19.

Connect the neutral switch connector (A).

20.

Install the ground wire by installing a bolt.

21.

Connect the vehicle speed sensor connector (A) and the back lamp switch connector (B).

22.

Install the air intake hose (A) and the air cleaner assembly (B) after connecting the connector (C) and the ECM connector (D).

23.

Install the radiator grill upper cover (A) and the air duct (B).

24.

Install the battery tray (A) after removing the bolts.

25.

Install the battery (A) and connect the negative battery terminal.

Яндекс.Метрика