Thoroughly check connectors for looseness, poor connection, bending, corrosion, contamination, deterioration, or damage.

Power Circuit Inspection
1.

Disconnect the Inhibitor swtich connector.

2.

Ignition KEY "ON"" & Engine "OFF".

3.

Measure voltge between supplied power and ground at inhibitor circuit.

Specification : Approx. 12V

Signal Circuit Inspection
1.

Connect the Inhibitor switch connector.

2.

Ignition KEY "ON" & Engine "OFF".

3.

Measure voltages between each terminal and chassis ground during shift lever changed "P, R, N, D".

Specification : See below "Signal Code Table"

Signal Code Table

 

P

P-R

R

R-N

N

N-D

D

Signal "1"

12V

12V

0

0

0

0

0

Signal "2"

0

12V

12V

12V

0

0

0

Signal "3"

0

0

0

12V

12V

12V

0

Signal "4"

0

0

0

0

0

12V

12V

Removal
1.

Turn ignition switch OFF and disconnect the negative (-) battery cable.

2.

Remove the shift cable (A).

3.

Remove the manual control lever (D) after removing a nut (C).

4.

Remove the inhibitor switch assembly (F) after removing the bolts (E).

Tightening torque:

[C] 16.7 ~ 25.5 N.m (1.7 ~ 2.6 kgf.m, 12.3 ~ 18.8 lb-ft)

[E] 9.8 ~ 11.8 N.m (1.0 ~ 1.2 kgf.m, 7.2 ~ 8.7 lb-ft)

Installation
1.

Installation is the reverse of removal.

note

Assembly the control lever (G) after seeting hole (H) aligning.