Installation
caution
●

Install the component with the specified torques.

●

Note that internal damage may occur when the component is dropped. In this case, use it after inspecting

caution
●

Apply the engine oil to the injector O-ring.

caution
●

Inspect the injector O-ring when installing.

1.

Installation is reverse of removal.

Delivery pipe installation bolt:

19.6 ~ 24.5 N.m (2.0 ~ 2.5 kgf.m, 14.5 ~ 18.1 lb-ft)

Delivery pipe installation nut (↔ Fuel feed tube):

3.9 ~ 5.9 N.m (0.4 ~ 0.6 kgf.m, 2.9 ~ 4.3 lb-ft)

Яндекс.Метрика