Charging System Inspection
1.

If time after engine "OFF" is not past 20 minutes, turn the ignition switch "ON" and operation electrical devices (such as head light, blower motor, rear defoger and etc.) to remove residual voltage.

2.

Turn the ignition switch and other electrical devices "OFF".

3.

Measure the voltage between (+) terminal and (-) terminal of battery.

Specification : 12.5 ~ 12.9V (68℉/20℃)

4.

Engine "ON"

5.

Measure the voltage between (+) terminal and (-) terminal of battery

Specification : Approx. 13.5V

6.

Is the measured value within specification?

▶ Go to "Wiring Inspection" procedure.

▶ Carefully re-do this troubleshooting guide steps.

▶ If no problems were found with the circuits or connectors, replace battery or check and repair charging system and then go to "Verification of Vehicle Repair" procedure.

Яндекс.Метрика