Component Inspection
■ Charging Voltage Inspection
1.

Ignition switch "ON" & Engine "ON"

2.

Turn on the all the electronic devices "ON".

3.

Maintain engine speed at approx. 2,500RPM.

4.

Measure the voltage between (+) terminal and (-) terminal of battery.

Specification : Approx. 13.5 ~ 14.5V

5.

Is the measured value within specification?

▶ Carefully re-do this troubleshooting guide steps.

▶ If no problems were found with the circuits or connectors, replace the ECM and go to "Verification of Vehicle Repair" procedure.

▶ Carefully re-do this troubleshooting guide steps.

▶ If no problems were found with the circuits or connectors, replace the Alternator and go to "Verification of Vehicle Repair" procedure.

caution

After replacing the ECM, the injector specific data (7 digit) of each cylinder MUST be input into ECM with the GDS

In the case the vehicle is equipped with immobilizer or smart key, perform "KEY TEACHING" procedure together (Refer to "Immobilizer" or "Smart key system" in BE group)

Vehicle S/W Management
■ In case of ECM is replaced, perform follwoing procedures;
1.

Ignition Switch "OFF"

2.

Connect GDS to Data Link Connector(DLC).

3.

Ignition Switch "ON" & Engine "OFF"

4.

Perform "Essential Work After Component Replacement" in "Vehicle S/W Management" with GDS.

5.

Select "ECU Change"

Fig.1) Vehicle S/W Management list of U2 engine

Fig.2) "Essential Work After Component Replacement"

Fig.3) ECU Change

Fig.4) ECU Change confirmation message

Fig.5) Complete

Яндекс.Метрика