Connect GDS to Data Link Connector(DLC).
IG KEY "ON" & ENG "OFF".
Perform "Actuation Test" for PCSV.
Fig.1) Canister Purge Valve Actuation Test
IG Key "OFF".
Disconnect PCSV connector.
Measure resistance between power and control terminal of the PCSV. (Component Side)
Fig.1) 'Zero Set' Function
Specification : Approx 16.0 [20°C(68 °F)]
Is the measured Value within specification?
![]() | ▶ Go to "Check injector for normal operation" as follows. |
![]() | ▶ Replace it, and go to "Verification of Vehicle Repair" procedure. |
Connect GDS to Data Link Connector(DLC).
IG KEY "ON" & ENG "OFF".
Perform "Actuation Test" for Injector.
Fig.1) Injector Disable - Cylinder 1,2,3,4 Actuation Test
Check its RPM decrease when doing the injector's actuation test.
Is there any cylinder with no change in RPM or only a small change in RPM?
![]() | ▶ Carefully re-do this troubleshooting guide steps. ▶ If no problems were found with the circuits or connectors, replace the Injector and go to "Verification of Vehicle Repair" procedure. |
![]() | ▶ Go to "Verification of Vehicle Repair" procedure. |