Component Inspection
1.

Ignition switch "OFF"

2.

Disconnect battery (-) cable.

3.

Refer to "Shop Manual" and disconnect ACV connector.

4.

Measure the resistance between Pin No. 1 (Motor +) terminal and Pin No. 2 (Motor -) terminal of ACV.

Specification : Approx. 2.65 - 3.25Ω (Approx. 20℃/Approx. 68℉)

5.

Is the measured value within specification?

▶ Fault is intermittent caused by poor contact in the sensor’s and/or ECM’s connector or was repaired and ECM memory was not cleared. Thoroughly check connectors for looseness, poor connection, bending, corrosion, contamination, deterioration, or damage. Repair or replace as necessary and go to "Verification of vehicle Repair" procedure.

▶ Carefully re-do this troubleshooting guide steps.

▶ If no problems were found with the circuits or connectors, replace the ACV and go to "Verification of Vehicle Repair" procedure.

caution

When installing component, tighten it within specification

If component is dropped, check for proper operation. The internal damage may be present

caution

When ACV is replaced, perform "Essential work after component replacement. Otherwise, vehicle performance and emission control may not work properly until auto learning is completed.

Vehicle S/W Management
■ In case of ACV is replaced, perform follwoing procedures;
1.

Ignition switch "OFF"

2.

Connect GDS to Data Link Connector (DLC).

3.

Ignition switch "ON" & Engine "OFF"

4.

Perform "Essential Work After Component Replacement" in "Vehicle S/W Management" with GDS.

5.

Select "Throttle Valve"

Fig.1) Vehicle S/W Management list of U2 engine

Fig.2) "Essential Work After Component Replacement"

Fig.3) Throttle vale Change

Fig.4) Complete

Яндекс.Метрика