Removal and Installation
[LHD]
1.

Disconnect the battery negative terminal.

Tightening torque:

4.0 ~ 6.0N.m (0.4 ~ 0.6kgf.m, 3.0 ~ 4.4lb-ft)

2.

Remove the crash pad lower panel.

(Refer to Body - "Crash Pad Lower Panel")

3.

Disconnect the DC/DC converter conector (A).

4.

Remove the DC/DC converter (A).

5.

Installation is reverse order of removal.

note

After disconnecting then reconnecting the battery negative cable, the ISG function dose not operates until the system is stabilized, about 4 hours.

[RHD]
1.

Disconnect the battery negative terminal.

Tightening torque:

4.0 ~ 6.0N.m (0.4 ~ 0.6kgf.m, 3.0 ~ 4.4lb-ft)

2.

Remove the crash pad lower panel.

(Refer to Body - "Crash Pad Lower Panel")

3.

Disconnect the DC/DC converter connector (A).

4.

Remove the DC/DC converter (B).

5.

Installation is reverse order of removal.

note

After disconnecting then reconnecting the battery negative cable, the ISG function dose not operates until the system is stabilized, about 4 hours.

Яндекс.Метрика