Inspection
1.

Connect the GDS on the Data Link Connector (DLC).

2.

Turn the ignition switch ON.

3.

Measure the output voltage of the APS 1 and 2 at C.T and W.O.T.

Accelerator

Position

Output Voltage (V) [Vref = 5V]

APS1

APS2

C.T

0.7 ~ 0.8

0.29 ~ 0.46

W.O.T

3.85 ~ 4.35

1.93 ~ 2.18

Яндекс.Метрика