Removal and Installation
1.

Disconnect the negative battery terminal.

2.

Drain the coolant.

(Refer to Cooling System - "Coolant")

3.

Remove the drive belt.

(Refer to Drive Belt System - "Drive Belt")

4.

Remove the water pump pulley (A).

Tightening torque :

9.8 ~ 11.8 N.m (1.0 ~ 1.2 kgf.m, 7.2 ~ 8.7 lb-ft)

5.

Remove the water pump (A) and O-ring (B).

Tightening torque :

9.8 ~ 11.8 N.m (1.0 ~ 1.2 kgf.m, 7.2 ~ 8.7 lb-ft)

6.

Install in the reverse order of removal.

7.

Fill with engine coolant.

8.

Start the engine and check for leaks.

9.

Recheck the engine coolant level.

Яндекс.Метрика