Installation

Install in the reverse order of removal.

Perform the followings :

●

Adjust shift cable.

●

Adjust throttle cable.

●

Refill engine with engine oil.

●

Refill transaxle with fluid.

●

Refill radiator and reservoir tank with engine coolant.

●

Switch heater control knob to "HOT" position.

●

Bleed air from the cooling system.

-

Start engine and let it run until it warms up (until the radiator fan operates 3 or 4 times).

-

Turn Off the engine. Check the level in the radiator, and add coolant if needed. This will allow trapped air to be released from the cooling system.

-

Put radiator cap on tightly, then run the engine again and check for leaks.

●

Clean battery posts and cable terminals with sandpaper. Then, assemble them and apply grease to prevent corrosion.

●

Inspect for fuel leakage.

-

After assembling the fuel line, turn on the ignition switch (do not operate the starter) so that the fuel pump runs for approximately two seconds and fuel line pressurizes.

-

Repeat this operation two or three times, then check for fuel leakage at any point in the fuel line.

Яндекс.Метрика