Removal and Installation
1.

Remove the engine cover.

2.

Remove the battery and the tray.

(Refer to Engine Electrical System - “Battery”)

3.

Remove the under cover.

4.

Drain the coolant.

(Refer to Cooling System - “Coolant”)

5.

Remove the air cleaner assembly.

6.

Remove the air control valve.

(Refer to Engine Control/Fuel System - “Air Control Valve (ACV)”)

7.

Disconnect the heater hoses (A).

8.

Disconnect the fuel hoses (A).

9.

Disconnect the EGR cooler hose (A) and vacuum hose (B).

10.

Remove the EGR cooler outlet pipe (A).

Tightening torque:

19.6 ~ 23.5 N.m (2.0 ~ 2.4kgf.m, 14.5 ~ 17.4 lb-ft)

11.

Remove the EGR pipe (A).

Tightening torque

Bolts (B) :

21.6 ~ 27.5 N.m (2.2 ~ 2.8 kgf.m, 15.9 ~ 20.3 lb-ft)

Bolts (C) :

29.4 ~ 34.3 N.m (3.0 ~ 3.5 kgf.m, 21.7 ~ 25.3 lb-ft)

12.

Remove the EGR cooler assembly (A).

Tightening torque

Bolts (B) :

19.6 ~ 23.5 N.m (2.0 ~ 2.4 kgf.m, 14.5 ~ 17.4 lb-ft)

Bolts (C) :

21.6 ~ 27.5 N.m (2.2 ~ 2.8 kgf.m, 15.9 ~ 20.3 lb-ft)

13.

Install in the reverse order of removal.

Яндекс.Метрика