Removal and Installation
1.

Disconnect the battery negative terminal.

2.

Remove the air cleaner assembly.

(Refer to Intake and exhaust system - "Air Cleaner")

3.

Remove the battery and tray

(Refer to Engine Electrical System - "Battery")

4.

Disconnet the over flow hose (A).

5.

Disconnect the fan motor connector (A).

6.

Remove the filler neck bolts (A).

Tightening torque :

6.9 ~ 10.8 N.m (0.7 ~ 1.1 kgf.m, 5.1 ~ 8.0 lb-ft)

7.

Remove the cooling fan assembly (A).

Tightening torque :

4.9 ~ 7.8N.m (0.5 ~ 0.8kgf.m, 3.6 ~ 5.8lb-ft)

8.

Install in the reverse order of removal.

Яндекс.Метрика