Removal and Installation
1.

Remove the battery and battery tray.

(Refer to Engine Electrical System - "Battery")

2.

Loosen the drain plug, and drain the engine coolant.

3.

Disconnect the heater hose.

(Refer to Cooling System - "Heater Hose")

4.

Disconnect Electric EGR control valve connector.

(U-II 1.4L : Refer to Fuel System - "Electric EGR Control Valve")

(U-II 1.6L : Refer to Fuel System - "Electric EGR Control Valve")

5.

Remove the EGR valve assembly (A).

6.

Remove the water hose (A).

7.

Disconnect the EGR cooler outlet pipe (A) from the EGR cooler.

Tightening torque:

19.6 ~ 23.5 N.m (2.0 ~ 2.4kgf.m, 14.5 ~ 17.4 lb-ft)

8.

Remove the EGR cooler pipe (A).

Tightening torque :

21.6 ~ 27.5N.m (2.2 ~ 2.8kgf.m, 15.9 ~ 20.3lb-ft)

Tightening torque :

29.4 ~ 34.3N.m (3.0 ~ 3.5kgf.m, 21.7 ~ 25.3lb-ft)

9.

Remove the EGR cooler (A).

Tightening torque :

21.6 ~ 27.5N.m (2.2 ~ 2.8kgf.m, 15.9 ~ 20.3lb-ft)

10.

Install in the reverse order of removal.

Яндекс.Метрика