Connect GDS to DLC(Data Link Cable).
Warm up the engine to normal operating temperature.
Perform the "Actuation Test" with GDS.
Fig.1) Variable Intake Manifold 1 Actuation Test
IG Key "OFF".
Disconnect VIS connector.
Measure resistance between power and control terminal of the VIS. (Component Side)
Specification : Approx. ???Ω [20°C(68 °F)]
Fig.2) Resistance of VIS
Does the PCSV operate properly? (Check variation)
![]() | ▶ Go to "Verification of Vehicle Repair" procedure. |
![]() | ▶ Carefully re-do this troubleshooting guide steps. ▶ If problem still occurs, replace PCSV and then go to "Verification of Vehicle Repair" procedure. |