Inspection
Front Deicer Relay

Check for continuity between the terminals.

1.

There should be continuity between the No.20 and No.10 terminals when power and ground are connected to the No.10 and No.9 in the ICM-A.

Folding Motor Relay

Check for continuity between the terminals.

1.

There should be continuity between the No.16 and No.19 terminals when power and ground are connected to the No.4 and No.8 in the ICM-A.

Unfolding Motor Relay

Check for continuity between the terminals.

1.

There should be continuity between the No.15 and No.18 terminals when power and ground are connected to the No.6 and No.8 in the ICM-A.

Яндекс.Метрика