Component Inspection
■ Perform ETC Motor Actuation Test
1.

Connect GDS to Data Link Connector(DLC).

2.

IG KEY "ON" & ENG "OFF".

3.

Perform "Actuation Test" for ETC Motor.

Fig.1) ETC Motor Actuation Test

■ Inspect ETC Motor
4.

IG Key "OFF".

5.

Disconnect ETC Motor connector.

6.

Measure resistance between Pin No.2(+) and Pin No.1(-) terminal of the ETC Motor. (Component Side)

Specification : 1.2 ~ 1.8 [20℃(68℉)]

■ Confirm Part Inspection
7.

Does the ETC Motor operate properly? (Check variation)

▶ Go to "System Inspection" procedure.

▶ If no problems were found with the circuits or connectors, Replace the ETC Motor.

Яндекс.Метрика