Component Inspection
■ Visual Check - HO2S(S1)
1.

IG "OFF" and disconnect HO2S(S1) connector.

2.

Check that HO2S(S1) is contaminated or damaged by foreign materials.

▶ Go to "Check PCV" as follows.

▶ Replace it, and go to "Verification of Vehicle Repair" procedure.

■ Check PCV
3.

Connect GDS to Data Link Connector(DLC).

4.

IG KEY "ON" & ENG "OFF".

5.

Perform "Actuation Test" for PCSV.

Fig.1) Canister Purge Valve Actuation Test

6.

IG Key "OFF".

7.

Disconnect PCSV connector.

8.

Measure resistance between power and control terminal of the PCSV. (Component Side)

Specification : Approx. 2.0kΩ [20°C (68°F)]

Fig.2) Resistance of PCSV

9.

Does the PCSV operate properly and is the measured resistence within specification?

▶ Go to "Check injector for normal operation" as follows.

▶ Replace it, and go to "Verification of Vehicle Repair" procedure.

■ Check injector for normal operation
10.

Connect GDS to Data Link Connector(DLC).

11.

Perform "Actuation Test" for Injector.

Fig.3) Injector Disable - Cylinder 1,2,3,4 Actuation Test

12.

Check its RPM decrease when doing the injector's actuation test.

13.

Is there any cylinder with no change in RPM or only a small change in RPM?

▶ Replace injector, and go to "Verification of Vehicle Repair" procedure.

▶ Go to "Verification of Vehicle Repair" procedure.

Яндекс.Метрика