Component Inspection
1.

Connect GDS to DLC(Data Link Cable).

2.

Warm up the engine to normal operating temperature.

3.

Perform the "Actuation Test" with GDS.

Fig.1) Variable Intake Manifold 1 Actuation Test

■ Inspect VIS
4.

IG Key "OFF".

5.

Disconnect VIS connector.

6.

Measure resistance between power and control terminal of the VIS. (Component Side)

Specification : Approx. ???Ω [20°C(68 °F)]

Fig.2) Resistance of VIS

■ Confirm Part Inspection
7.

Does the PCSV operate properly? (Check variation)

▶ Go to "Verification of Vehicle Repair" procedure.

▶ Carefully re-do this troubleshooting guide steps.

▶ If problem still occurs, replace PCSV and then go to "Verification of Vehicle Repair" procedure.

Яндекс.Метрика