Installation
1.

Install the cable retainer (A).

Tightening torque :

8.8 ~ 13.7 N.m (0.9 ~ 1.4 kgf.m, 6.5 ~ 10.1 lb-ft)

2.

Install the control cable soket (A).

3.

Install the shift cable from the shift lever after intalling the snap pin (A).

4.

Insert the snap pin after installing the select cable (A) to the shift lever.

5.

Install the floor console assembly.

(Refer to "Interior (Console)" in BD group)

6.

Install the control cable.

(1)

Check that the shift lever and control shaft are placed in the "4th" position.

(2)

Install the control cable to the cable bracket.

(3)

After pulling the holder (A) in the direction of the "P", pull the lock (B) in the direction of the "F".

(4)

Push the lock (C) after installing the control cable to the control shaft.

(5)

Insert the snap pin (A).

7.

Install the battery and battery tray.

(Refer to "Charging system" in EE group.)

8.

Install the air cleaner assembly.

(Refer to "Intake and Exhaust system" in EM group.)