Remove the floor Interior console assembly.
(Refer to "Interior(Console)" in BD group)
Remove the select cable snap pin (A) and then remove the select cable (B) from the shift lever pin.
Remove the clip (A) from the shift lever assembly.
Remove the clip (A) and then remove the shift cable (B) from the shift cable assembly.
Remove the shift lever assembly (B) after removing shift lever assembly installation bolt (A-4ea).
Tightening torque:
8.8 ~13.7 N.m (0.9 ~ 1.4 kgf.m, 6.5 ~10.1 lb-ft)
Installation is the reverse of removal.
When installing, set room side shift lever and T/M side lever to "Neutral" position.
When installing, adjust the Control cable.
(Refer to " Control Cable adjustment procedure " in this group.)