Installation
caution
●

Install the component with the specified torques.

●

Note that internal damage may occur when the component is dropped. In this case, use it after inspecting.

caution
●

Apply the engine oil to the injector O-ring.

caution
●

Inspect the injector O-ring when installing.

1.

Install in the reverse order of removal.

Delivery pipe installation bolt:

18.6 ~ 23.5 N.m (1.9 ~ 2.4 kgf.m, 13.7 ~ 17.4 lb-ft)

Delivery pipe installation nut (↔ Fuel feed tube):

7.8 ~ 9.8 N.m (0.8 ~ 1.0 kgf.m, 5.8 ~ 7.2 lb-ft)

Яндекс.Метрика