Disconnect the VIS 1 and PCM connectors and inspect for looseness, poor connection, bending, corrosion, contamination, deterioration or damage. Reconnect the connectors.
Connect the GDS and go to "Current Data".
Monitor VIS 1 values in Current Data, check and wiggle the harness(es), connector(s), and terminal(s).
Any change in the values indicates a poor connection. Was a connector problem found?
![]() | ▶ Repair the connector. Go to "Verification of Vehicle Repair" procedure. |
![]() | ▶ Go to " Power Circuit Inspection " procedure. |
IG "OFF". Disconnect VIS 1 connector.
IG "ON"
Measure voltage between power terminal of VIS 1 harness connector and chassis ground.
Specification : Approx. B+ (Battery Voltage)
Is the measured voltage within specification ?
![]() | ▶ Go to "Control Circuit Inspection" procedure. |
![]() | ▶ Check fuse connected to power of VIS 1 for open or blown-off. ▶ Repair open or short to ground in harness. Go to "Verification of Vehicle Repair" procedure. |
IG "OFF". Disconnect VIS 1 connector and PCM connector.
Measure resistance between control terminal of VIS 1 harness connector and chassis ground.
Specification : Infinite
Is the measured resistance within specification ?
![]() | ▶ Go to "Check open in harness" as follows. |
![]() | ▶ Repair short to ground in harness. Go to " Verification of Vehicle Repair" procedure. |
IG "OFF". Disconnect VIS 1 connector and PCM connector.
Measure resistance between control terminal of VIS 1 harness connector and VIS 1 control terminal of PCM harness connector.
Specification : Below 1Ω
Is the measured resistance within specification ?
![]() | ▶ Go to " Component Inspection" procedure. |
![]() | ▶ Repair open in harness, and go to "Verification of Vehicle Repair" procedure. |