Installation
caution

Do not use already used injector fixing clip again.

caution

Install the component with the specified torques.

Note that internal damage may occur when the component is dropped. In this case, use it after inspecting.

caution

Apply engine oil to the injector O-ring.

Do not use already used injector O-ring again.

caution

Do not use already used bolt again.

caution

When insert the injector, be careful not to damage the injector tip.

caution

When tightening the delivery pipe installation bolts, tighten them in accordance with the order (① → ② → ③ → ④) after tightening with hand-screwed torque.

1.

Install in the reverse order of removal.

Delivery pipe installation bolt:

18.6 ~ 23.5 N.m (1.9 ~ 2.4 kgf.m, 13.7 ~ 17.4 lb-ft)

High pressure fuel pipe installation nut:

26.5 ~ 32.4 N.m (2.7 ~ 3.3 kgf.m, 19.5 ~ 23.9 lb-ft)

Яндекс.Метрика