Component Inspection
■ Perform RCV
1.

Connect GDS to Data Link Connector(DLC).

2.

IG KEY "ON" & ENG "OFF".

3.

Perform "Actuation Test" for RCV.

■ Inspection RCV
4.

IG Key "OFF".

5.

Disconnect RCV connector.

6.

Measure resistance between power and control terminal of the RCV. (Component Side)

Specification : Approx. 29.7 ± 1.4 Ω (20°C(68°F)

■ Confirm Part Inspection
7.

Does the RCV work properly? (Check variation)

▶ Go to "Verification of Vehicle Repair" procedure.

▶ Substitute with a known-good RCV and check for proper operation. If the problem is corrected, replace RCV and then go to "Verification of Vehicle Repair" procedure.

Яндекс.Метрика