Component Inspection
1.

Check Solenoid Valve

(1)

Ignition "OFF".

(2)

Disconnect "A/T SOLENOID VALVE" connector.

(3)

Measure resistance between "PCSV-D(DCCSV)" terminal and "Ground" terminal of the ATM SOLENOID VALVE harness connector.

Specification : Approximately 3.5 ± 0.2 Ω (25℃)

(4)

Is resistance within specifications?

▶ Go to "CHECK PCM/TCM" as below.

▶ Replace DCC SOLENOID VALVE as necessary and go to "Verification Vehicle Repair" procedure.

2.

Check PCM/PCM/TCM

(1)

Connect GDS to data link connector(DLC)

(2)

Ignition "ON" & Engine "OFF".

(3)

Select A/T Solenoide valve Actuator test and Operate Actuator test.

(4)

Is Actuator Testing performed normally ?

▶ Go to "Verification Vehicle Repair" procedure.

▶ Replace PCM/TCM as necessary and Go to "Verificaiton Vehicle Repair" procedure.

ACTUATOR TEST CONDITION

1. IG SWITCH ON

2. TRANSAXLE RANGE SWITCH is normal

3. P RANGE

4. Vehicle Speed 0km/h

5. Throttle position sensor< 1V

6. IDLE SWITCH ON

7. ENGINE RPM 0

Яндекс.Метрика